University of Nottingham

The latest development proposed at Jubilee Campus is the Power Electronics and Machines Centre (PEMC). This is to be situated adjacent to the recently completed RAD Building. The facility will provide office accommodation, laboratory, workshop space, meeting rooms and ancillary spaces for the Power Electronics, Machines and Control Group within the Faculty of Engineering.

University of Bristol

The University of Bristol development will include academic teaching space and a student village that will accommodate 1,500 students, as well as a gym and health centre. In addition, there will be the world’s first open access Quantum Technologies Innovation Centre. The project will provide an extensive public realm focused on improving neglected areas of the harbour, providing new cycle paths and walkways, public spaces, cafes and other facilities.

Holdenhurst Road

Holdenhurst Road is a fifteen storey concrete frame and will provide 392 student bedrooms and over 2900m2 of academic space for Bournemouth University

Southampton Solent University Sports Building

A new £28 million state-of-the-art sports facility is to be built in the centre of Southampton. Southampton Solent University’s new facility will include two new sports halls, three fitness studios and two gyms on its East Park Terrace campus. It is the latest step in an ongoing £100 million development plan which the university hopes […]

Queensferry High School

City of Edinburgh Council has granted planning consent for the construction of a £40m Queensferry High School. A green light for the 1,200-place school emphasizes physical education with a sports hall, six-lane swimming pool and a 3G sports pitch in addition to a running track. Built on the current school’s playing field, which will be […]

The University of Edinburgh

CDD have been appointed to complete the RC Detailing of the concrete frame including basement and foundations. The University of Edinburgh is progressing a £32m Innovation Centre and Campus Hub at its Easter Bush Campus. The new building will provide laboratory and office space alongside a public outreach center and hub facilities. for all based […]

MMU

CDD have been appointed to complete the RC Detailing for the full concrete frame and the basement. Plans for Manchester Metropolitan University’s new flagship Arts and Humanities building have been given the green light by Manchester City Council. The new Arts and Humanities building will provide outstanding state of the art facilities including theatre spaces, […]

Bower Ashton

CDD have been appointed to provide RC Detailing for the full concrete frame. The University of West England is forging ahead with exciting developments at the Bower Ashton Campus in the south of the city. The plans include demolition of three of the current blocks at Bower Ashton Campus and the addition of three new three storey buildings […]

Barnsley Library

CDD have been appointed to complete all the Reinforcement Detailing for the exposed concrete frame. Barnsley town centre is undergoing a huge development including the opening of a brand new central library in 2017. The futuristic, £4 million, purpose built library which is local to our head office is part of a £50 million town […]

MECD

MECD will deliver a sense of vibrancy by consolidating and welcoming the four engineering Schools into the heart of the campus. The University of Manchester has embarked on a £1 billion ten year plan to create a world-class, single campus for their students, staff and visitors. The new engineering campus will provide a range of modern facilities in […]