Oxford Road

Oxford Road comprises of 430-bed student development on Oxford Road in Bournemouth. The 16-storey development is a high-quality, cluster-led scheme with extensive communal facilities of the Lansdowne campus of Bournemouth University.

Crown House (Sheffield)

Crown House is set to become a 350-bed student flat complex and this development on West Bar will involve the vacant offices being converted into apartments for students at both city universities. The development will sit directly opposite Sheffield Crown Court and plans to spend £20m building two more blocks to create a 350-bed complex […]

The Bottle Store (London)

CDD Ltd were appointed to undertake all RC detailing. The Bottle Store will provide a 350 bed student residence plus a 38 unit affordable housing scheme. Also it will have 24,000 sq ft of employment space, most of which is dedicated to specialist, low cost artist studios.

Sovereign House (Sheffield)

CDD Ltd was appointed to undertake RC detailing of strengthening works of cores Sovereign house was a conversion project it the heart of Sheffield that provides a mix of beautiful studio and 1-bedroom apartments that are perfect for the influx of students in the area.

Broad Lane (Sheffield)

CDD Ltd were appointed to undertake all superstructure RC detailing. Development on broad lane will bring a complex of en suite flats for students on the doorstep of the University of Sheffield and will accommodate 224 students.

Bath Lane (Leicester)

CDD Ltd were appointed to undertake all aspects of RC detailing. This project includes the construction of the 601 bedroom student accommodation development, including ancillary management and communal facilities and ground floor commercial units. The project also includes provision of associated parking, highway improvement work, amenity space and landscaping.

Sheffield Hallam Campus

Sheffield Hallam University’s Collegiate Campus is a major £25 million investment project which will create impressive new facilities in the leafy grounds. CDD Ltd were appointed to undertake all aspects of RC detailing of this project. The development will result in a completely new building in place of the current Heart of the Campus, with […]