Deakins Place

CDD was appointed to undertake RC detailing of the substructure for this student accommodation. The seven-storey purpose-built development comprises of 703 student beds in a mix of cluster bedrooms in groups ranging from 5-8 people, plus 85 individual studios occupying most of the top floor level, allowing a setback to be achieved. The scheme also […]

Baird Hospital and Anchor Centre

CDD was appointed to undertake the RC detailing of the full concrete frame for the Baird Hospital and the RC detailing of the foundation and metal decking for the Anchor Centre. The Baird Family Hospital and The Anchor Centre is a £233.2 million building development in Aberdeen. This project will result in two new buildings […]

Unity & Armouries

CDD was appointed to undertake the RC detailing of the full frame and foundations for the mixed-use residential scheme. The development, which will create 162 build to rent apartments, commercial units and related facilities including car parking, is located in two plots of land to the south of Birmingham City Centre and is within walking distance […]

CEG Southbank

CDD was appointed to undertake the RC detailing of the cores, foundations, ground floor slab and the upper decking slabs for this seven-storey building. The scheme will deliver some of the highest quality workspace in the city, with ground floor break-out space, business lounge and café kitchen. When complete, it will provide flexible workspace for […]

Frederick House

CDD was appointed to undertake the RC detailing of the full frame and foundations for the 6-block student accommodation. The scheme will provide student accommodation within a former military barrack’s. A total of 368 bedrooms are planned for the new purpose-built accommodation and the site will include excellent social and study provision within the existing […]

Aspire Bristol

CDD was appointed to undertake the RC detailing for the basement, ground floor, cores and metal decking for this 200,000sq ft building. Located in the heart of Bristol, the Aspire building will provide 8 storeys of offices producing an estimated 2,500 new jobs. This striking glass building provides high-quality office space and additional amenities that […]

Barnfield College

CDD was appointed to undertake the RC Detailing of the full frame and foundations. Located in Luton, Barnfield College will provide a 6,000sq metre facility and will accommodate skills delivery for mainstream employment sectors and specialist skills in digital and engineering, it will allow for the expansion of learning provision in space better suited to […]

20 Station Road

CDD was appointed to undertake the RC Detailing of the basement, ground and cores for the 65,000sq ft office building in Cambridge. The six-storey office building will house a collection of businesses from across the world. The space will be uniquely designed to reflect the local area and include open desks, private offices, meeting rooms, […]

University College Dublin

CDD was appointed to undertake all of the RC Detailing for this 8,000m² building. The new €48 million landmark building located at the main N11 entrance to UCD will be surrounded by a plaza and a reflecting pool. It will display prismatic forms inspired by geology and feature an abundant use of natural light coming […]

Queens Road, Nottingham

The Queens Road development is proposed as a mixed use comprising hotel, student accommodation and Build to Rent residential, providing 197,250ft² over 10 floors. The site will include a mix of studio, one, two & three-bedroom apartments with amenities and commercial space at ground floor level. CDD were appointed to undertake all the RC Detailing […]